Mobile
Log In Sign Up
Home > chinese-english > "作业施工" in English

English translation for "作业施工"

job execution

Related Translations:
水利工程施工:  hydraulic engineering construction
施工队长:  spread superintendent
施工编号:  construction number
施工车辆:  construction vehicle
施工监测:  observation during and after construction
施工规程:  construction regulations
铺面施工:  pavement construction
施工技术:  co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
施工绞车:  builders winch
施工布局:  construction layout
Example Sentences:
1.Execution of special geotechnical works - diaphragm walls
特种土工作业施工.隔墙
2.Execution of special geotechnical works - jet grouting
特种土工作业施工.喷射灌浆
3.Execution of special geotechnical works - reinforced fill ; german version en 14475 : 2006
特种土工作业施工.加固灌浆
4.Cold work , poison - free and odor - free , no pollution , suitable to the waterproof building of production of drinking water and food
作业施工,无毒无味、无污染,适用于饮用水,食品加工的建筑防水项目。
5.The road construction machinery group of engineering machinery is composed of complex system by the corn bined operative construction of multi kind and high performance machineries
摘要工程机械筑路机群系统是由多机种、高性能机械联合作业施工构成的复杂系统。
6.The main factors causing the failure of the reinforced plastic fiberglass sucker rod lie in product quality , manufacturing technology , load bearing , well conditions , operation , transportation and storage
影响玻璃钢抽油杆失效的主要因素包括材料质量、制造工艺、承受载荷、井况、作业施工、运输和储存等几个方面。
7.Finally , the factor which play a decisive role is presented , it provides a theoretical support for cementing operation and how to adjust and control the drilling as well as how to determine cementing parameters
运用模糊数学的理论之一?多级综合评判方法对影响固井优质率的三大因素进行了综合评判,初步得出了哪一类因素起着主导作用的结论,为固井作业施工以及如何合理地进行调控钻井参数和固井作业参数提供了理论依据。
8.To prevent premature failure of the reinforced plastic fiberglass sucker rod , high quality products should be purchased , proper wells should be selected , the rod string design should be based on the stress range chart and operation and management should be carried out according to requirements
为防止玻璃钢抽油杆早期失效,应严把产品进货质量关;正确选择油井;按应力范围图进行玻璃钢杆柱设计;按要求作业施工;完善生产管理措施。
Similar Words:
"作业设计" English translation, "作业申请单" English translation, "作业深度" English translation, "作业审计" English translation, "作业失败" English translation, "作业时的定额" English translation, "作业时间" English translation, "作业时间报告" English translation, "作业时间的期待值" English translation, "作业时间界限" English translation