English translation for "实地测量"
|
- field surveying
site measurement
Related Translations:
实地: 1.(在现场) on the spot2.(实实在在) indeed; in real earnest◇实地查勘 field reconnaissance; 实地盘存 physical inventory; 实地调查 fact finding; 实地工作 fieldwork; 实地考察 on-the-spot investigation [inspection]; 实地考察 实地观察: field observationfirst hand observationsite observation 实地核查: on-site inspection (osi) 实地研究: field researchfield study
- Example Sentences:
| 1. | The spot measurement : the designer goes to the spot to measure the area and position of the room wall , heating system , doors and windows 现场测量:设计师到施工现场实地测量,包括房间墙壁面积、门窗暖气面积及位置。 | | 2. | Acoustics - determination of sound insulation performance of sound protecting cabins - laboratory and in situ measurements iso 11957 : 1996 ; german version en iso 11957 : 1996 声学.隔音间隔音性能测定.实验室测量和实地测量 | | 3. | Before the measuring , workers pushed wagons and dollies loaded with toys and rode bicycles into the stocking . promoters also reported more than 500 coats , hats and assorted clothes were donated 在实地测量开始之前,工人们用婴儿车和手推车将这些玩具从远处运来,然后再骑自行车将它们送到袜子内。 | | 4. | But for trainee teacher and pinglin graduate wang kunwei the noise has been a continual annoyance since construction on the tunnel started when he was a junior high school student 根据教育局实地测量分贝,全在合格?围,但在坪林国中担任实习老师的王?韦,自己还在就读坪林国中时,他经历了雪山隧道开挖最吵的施工期。 | | 5. | But claxton said the stocking is n ' t the first time arkansans have set a guinness world record . among the state ' s other accomplishments are the heaviest twins , who weighed a total of 27 . 12 pounds when they were born feb . 20 , 1924 据美联社12月5日报道,做为吉尼斯世界纪录方面的代表,英格兰人斯图尔特克拉克斯顿于12月3日专程从纽约飞到阿肯色州,对这只袜子进行实地测量。 | | 6. | The two national land use surveys , which have made use of remote sensing data as well as detailed fieldworks , and which have taken many years to complete , have adopted a highly elaborate classification system . highly refined categories of agricultural and pasturelands were identified 历经多年的两大全国性土地利用调查采用了遥感资料、详细的实地测量和精细的分类系统,从而对农业用地和牧场用地进行了高度细分。 | | 7. | In order to observe process and study the rule of producing and collecting dust , and to study the performance of high - voltage electrostatic dust - collecting system , a set of analog device is designed based on on - site measure for workshop of unloading coal of qing huangdao port 对秦皇岛煤码头翻车机房进行实地测量,设计制造了试验模拟装置。观察翻卸作业起尘与收尘的物理过程,描绘起尘量与收尘量之间的变化规律。检验了高压静电除尘器的工作性能。 | | 8. | Firstly , we made investigations for reconstructed effects by measurements and surveys at sites , and made evaluations of social function using blurry synthetic evaluation methods . secondly , we analysed and valued the ecological functions , taking the fixed volume calculation of gardening vegetables the various types of ecological functions of garden and the fixed analysis of the ecological adjustment as the basic methods . lastly , in the thesis , many methods are used to calculate the value of economic values , such as shadow project method , market - value method , substitute method , and so on 首先,通过实地测量和问卷调查等方法对其改造效果进行调查,并且运用模糊综合评价法对其社会功能进行评价;其次,以城市园林绿化绿量计算为基础,以园林植物不同种类生态功能定量计算为基本方法,对其生态功能进行了分析和估算;最后,运用碳税法、造林成本法、影子工程法、市场价值法、条件价值法、替代法等方法,估算了其经济功能。 | | 9. | In the second part , the new method is compared with the old one in such aspects as system structure and signal processing methods . in the third part , the properties of dsss and lfm systems , especially the echo signal correlation processing of the systems are discussed . the last part are the respective analyses of water - pipe simulation experiment results and the trial results in zhong yuan oil field 本文首先介绍了超声测距的基本原理,分析了信道的声传输特性;接着将传统液位测量方法和新型液位测量方法的系统构成和信号分析处理方法做比较;然后对系统的发射信号(直接序列扩频信号和线性调频信号)的特点进行了研究,并着重讨论了回波信号的相关处理;最后对水管模拟实验测量结果和油田实地测量结果分别进行了分析和讨论。 | | 10. | To the measurement of the area of the balcony on the spot , thus the measurement of the balcony connected with room , etc . is according to all area ; the measurement of the balcony with partition wall ( cuts off ) is not including area calculation ; the partition wall ( cuts off ) is connected with room , etc . with the as a organic whole balcony after being removed , its measurement is to calculate by 50 % of its use area of ground 实地测量中对阳台面积的计算,与房间等连在一起的阳台按全面积计算;有隔墙(隔断)间隔的阳台不计算面积;隔墙(隔断)拆除后与房间等连为一体的阳台,按其地面使用面积的50计算。 |
- Similar Words:
- "实地" English translation, "实地;就地;现" English translation, "实地安全状况咨询报告" English translation, "实地版" English translation, "实地测定的折旧" English translation, "实地测量的" English translation, "实地测试" English translation, "实地测试;工地测试" English translation, "实地测试;现测试" English translation, "实地测试;现场测试" English translation
|
|
|