English translation for "基本建设程序"
|
- capital construction procedure
Related Translations:
基本建设: capital construction◇基本建设投资 investment in capital construction 缩短基本建设: slash the capital construction 农业基本建设: capital construction in agriculture 基本建设计划: plan of capital construction 基本建设项目: capital construction itemcapital construction projectcapital improvement projectcapital projects 基本建设工程: capital construction projectscapital works 非生产性基本建设: nonproductive projects in capital construction 商业基本建设: commercial capital construction 基本建设概算: budgetary estimate of capital construction
- Example Sentences:
| 1. | Article 22 highway construction should be undertaken in accordance with procedures for infrastructural construction as provided for by the state and related regulations 第二十二条公路建设应当按照国家规定的基本建设程序和有关规定进行。 | | 2. | Post assessment is an important component and the last link of the capital construction procedure , and also an important part of the fixed assets investment management 摘要后评价是水利基本建设程序的重要组成部分和最后环节,是固定资产投资管理的一项重要内容。 | | 3. | When submitted for approval according to the procedures set by the state for capital construction , the feasibility study report of the construction project should include the flood impact assessment report having been examined and approved by the relevant water conservancy administrative department 建设项目可行性研究报告按照国家规定的基本建设程序报请批准时,应当附具有关水行政主管部门审查批准的洪水影响评价报告。 | | 4. | When the feasibility study report for flood control works or other hydraulic works and hydropower stat ions stipulated in the preceding paragraph is submitted for approval pursuant to the procedures set by the state for capital construction , a consent document for planning issued by the relevant water conservancy administrative department which conforms to the requirements of flood control planning should be enclosed as an appendix 前款规定的防洪工程和其他水工程、水电站的可行性研究报告按照国家规定的基本建设程序报请批准时,应当附具有关水行政主管部门签署的符合防洪规划要求的规划同意书。 | | 5. | Project evaluation analyzes and demonstrates the feasibility , the rationality , the validity and the dependability of project investments from many aspects such as the input and output , the resources allocation , the engineering technology , the organization management , the social economic benefit and the environmental influence 项目评估从投入产出、资源配置、工程技术、组织管理、社会经济效益、环境影响等方面分析和论证项目投资的可行性、合理性、有效性和可靠性。根据我国基本建设程序,我国项目评估可分为立项评估、中期评估和后评估。 | | 6. | This paper , on the base of comparison of the essential constructions between nativfc and abroad , completely and systematicly analysizes the target system of the quality - control in this kind of item , the concerned main parts of it and their status and role in this quality - control system , and preliminarily designs the governmental information system of quality - control , further , on the base of a special and universal management to the data form of this system . we have a preliminary attempt on the construction of the system ' s data base 本文在对比国内外基本建设程序的基础之上,全面系统分析了工程建设项目质量控制的目标体系,详细分析了我国当前的工程建设项目质量控制各相关主体及其在质量控制体系中的地位和作用;并初步设计了政府质量监控信息系统,在对政府质量监控信息系统的数据格式进行特殊统一设定的基础上,对其数据库建设进行了初步尝试。 | | 7. | The newly developed engineering management software system is characterized with clear data system and ideal interface , high reliability , flexibility , practicability and good operation . it will also help the users to know some national and regional laws and regulations in the line and basic engineering knowledge , improving the technicians " quality and service level so to upgrade the technology and management level of the construction market as a whole . featuring in its innovation and systematism , on march 12 , 2003 , this new software system passed the technic evaluation by national construction department of new technology 该系统数据结构清晰,用户界面友好,具有可靠性、灵活性、实用性、客观性和可操作性,不但有助于建筑各方了解国家的基础政武汉理工大学硕士论文策法规和基本建设程序,也有助于提高建筑企业_ [程技术人员的整体素质和业务水平,进一步提高了建筑市场的技术和管理水平,具有创造性和白成体系性,并且于2003年3月12日成功的通过了建设部科技成果评估。 | | 8. | Firstly , the development condition of the post assessment of highway construction project was introduced in this thesis . the signification , basic content , and assessment procedure of the post assessment were analyzed , and the relationship and difference between the post assessment and feasibility research were elaborated . then the post assessment for operation condition and operation management of chengdu chengbei entrance expressway were studied , some related proposed was put forward , in this thesis , the post assessment for operation condition and operation management was studied emphatically . the main contents of traffic survey were produced , the calculating methods of capacity and service level were studied and analyzed , and the idex system of the post assessment for operation condition was established 论文首先介绍了高速公路建设项目后评价是高速公路基本建设程序的重要组成部分,是管理周期中不可缺少的信息反馈环节,对全面总结项目前期工作,提高高速公路建设项目决策、设计、施工和运营管理水平具有重要的意义,已经成为全面、客观衡量项目前期工作,提高项目效益的重要手段;研究了高速公路建设项目后评价的发展现状,分析了后评价工作的意义、基本内容和程序,探讨了后评价与可行性研究的联系与区别。 |
- Similar Words:
- "基本建设财务预算" English translation, "基本建设成本" English translation, "基本建设成本估计数" English translation, "基本建设成本审计" English translation, "基本建设成本资本值" English translation, "基本建设的" English translation, "基本建设定额" English translation, "基本建设法" English translation, "基本建设费用" English translation, "基本建设费用和收入" English translation
|
|
|