English translation for "井塔"
|
- headframe
- Example Sentences:
| 1. | Base stability in constructing tower 井塔治理施工中基础稳定性分析 | | 2. | On the building technique of headframe and the drilling skill by using concrete headframe 利用混凝土井塔凿井与井塔交叉施工工艺 | | 3. | Numerical evaluation of the strip foundation beams under the pillars of the box - type hoist tower 箱形井塔柱列下条形基础梁的数值计算分析 | | 4. | A thorough quality control should be made in base construction . sixteen poles in longqiao iron mine poured into the wells can all satisfy designment requirement of engineering 摘要在桩基施工过程中进行全面的质量控制,龙桥铁矿竖井井塔16根人工挖孔扩底灌注桩工程质量全部满足设计要求。 | | 5. | Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure . sliding and pouring method , an alternate procedure for the construction of a coal mine shaft well project , the procedures are as following : 1 , the progress of each storey " s construction has been carried out step by step duly 2 , the construction of slabs and 3 , during construction , the light - type network structure has been used as a complementary operating platform for the sliding formwork construction . these synchronization procedures have achieved comprehensive economic benefit and social efficiency 文摘:协庄矿副立井井塔为现浇钢筋混凝土箱形结构,采用滑一浇一工艺进行煤矿井塔施工,施工顺序为塔壁逐层滑升,梁板逐层跟进,施工中利用井塔屋面轻型网架结构作为滑模辅助操作平台,同步滑升,取得了较好的综合经济效益和社会效益。 | | 6. | The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure . sliding and pouring method , an alternate procedure for the construction of a coal mine shaft well project , the procedures are as following : 1 , the progress of each storeys construction has been carried out step by step duly 2 , the construction of slabs and 3 , during construction , the light - type network structure has been used as a complementary operating platform for the sliding formwork construction . these synchronization procedures have achieved comprehensive economic benefit and social efficiency 协庄矿副立井井塔为现浇钢筋混凝土箱形结构,采用滑一浇一工艺进行煤矿井塔施工,施工顺序为塔壁逐层滑升,梁板逐层跟进,施工中利用井塔屋面轻型网架结构作为滑模辅助操作平台,同步滑升,取得了较好的综合经济效益和社会效益。 |
- Similar Words:
- "井酸化" English translation, "井损常数" English translation, "井损失" English translation, "井塌" English translation, "井塌卡住钻具的井眼" English translation, "井塔提升" English translation, "井台" English translation, "井台工" English translation, "井探" English translation, "井探测量器" English translation
|
|
|